________

Studies and Designs

Consultancy for the Feasibility Study and Design for the Construction of the Pacific Coast Highway

________

Studies and Designs

Technical Assistance for the review of the Master Plan and proposal for the establishment of ANS services at the Murcia Region International Airport

________

Project Management / Integrated Management

Supervision for the fencing, construction of safety strips, and maintenance of the runway, taxiway, and apron of the Leticia Airport

________

Work Supervision

Technical, administrative, and financial supervision for the construction of the terminal and maintenance works of the El Edén Airport in Armenia

________

Studies and Designs

Project for the adaptation of the Runway and Strip at La Palma Airport

________

Studies and Designs

Project for the adaptation of the airfield at Asturias Airport

________

Studies and Designs

Project for the Renovation and Adaptation of the Pavement on Taxiways S, T, and Apron Slabs 2 of Barcelona Airport

________

Project Management / Integrated Management

Construction Management for the rehabilitation of the runways at the Tacna Airport and the Arequipa Airport

________

Studies and Designs

Pavement Regeneration on the Runway at the Adolfo Suárez Madrid-Barajas Airport

________

Studies and Designs

Technical File for the Construction Investment at the Mayor General FAP Armando Revoredo Iglesias Airport in Cajamarca